Quanjiao
government and BizVision International have huge investment in setting up
the well-matched high class infrastructure to achieve the "Nine Supply and
One leveling" fundamental, which includes the road, water, drainage, sewage,
power, gas, telecommunication, internet and steam reaching each lot as well
as the leveled ground.
Road: The main roads with width of 50 meters and the
byroads with width of 40 meters inside. Roads are connected with sides
of each plot.
Water Supply:
Current water supply capacity is 6,000 ton per day. A new water plant
is under construction with daily water supply capacity up to 100,000 tons.
Power Supply:
Power supply is sufficient equipped with two 110kv substations and seven
35kv substations. No break down in either peak or non-peak seasons.
Gas Supply:
Natural gas is to be available soon for both industrial and residential
purpose. The storage and distribution station is within Quanjiao General
Economic Development Zone.
Drainage:
Drainage pipes are laid along the main roads and byroads.
Sewage:
Simplify sewage treatment is available and new system is under development.
Telecommunication:
Computer-controlled telephone line with capacity of 53,000 is available.
Providing optical cable, digital transmission, including IDD, DDD, ADSL,
FTTB and all kinds of data communication.
Internet:
The fiber broadband system is able to provide services like videoconference,
VOD, remote monitoring, virtual host computer and system integration.
Post Office:
A worldwide delivery post office is able to help investors to send the
mail in all necessary.
Ground
Levelling: The ground is compacted flat without any obstructions.
|